For one meter cube of concrete how much kg steel is required?

Jun 19, 2014· For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0.001, for bending with axial force mus =0.0025, b ...

Read More

How much labour is required for concrete placement when ...

Answer (1 of 4): There's no out of the book formulas to calculate this one. The minimum number of labours required would be at the least. These number are mostly apt for large slabs where there are multiple pours and shall not be necessary for small slabs. With the following or even lesser labour...

Read More

Important Thumb Rules For Estimation In Civil Engineering

Dec 26, 2020· For example, if a volume of concrete 1 m 3 for a slab. Approx Steel requirement = 1 x 7850 x 1% = 78.5 Kg/m 3. Read: Bar bending Shape codes. Thumb rule for shuttering work. The shuttering work is called by another name "Form Work" because it gives a uniform shape and smoothness for the concrete.

Read More

Labour required for 1 cubic meter concrete - it depends ...

As per the data the calulation goes like for 1 Cum Concrete the requirement of shuttering is 11.71813333 Sqm On concretable area for 1 Cum Concrete the requirement of shuttering is 3.767038414 Sqm On floor plate area Shuttering required for 1 Sqm on BUA 3.110701842 Sqm On BUA Concrete Coefficient / Sqm 3.767038414 Posted: 2187 days ago Enter ...

Read More

Rate analysis for PCC 1:4:8 (M7.5) - calculate quantity ...

Ans. INR 4845 is cost and rate analysis for 1 cum PCC 1:4:8 (M7.5). step 11 : rate per sq m for PCC 1:4:8 (m7.5), consider thickness of concrete structure is 150mm thick so Area of concrete structure in square metre = 1m3/0.15m = 6.67, 6.67 m2 concrete structure cost = INR …

Read More

Shuttering labour rate per sq ft | shuttering rate per sqm ...

Shuttering rate per sq ft:– in India, labour cost for shuttering only is range between Rs 20 to Rs 25 per sq ft, with bar bending it will be Rs 25 to Rs 30 per sq ft and for shuttering + bar bending + labour cost to pour concrete it will be Rs 40 to Rs 50 per sq ft for normal residential work with shuttering materials such as …

Read More

Quantity and Rate Analysis for Reinforced Concrete ...

The dry volume of total materials required is considered as 1.54 times the wet volume of concrete, due to voids present in sand and aggregates in dry stage. Therefore, for our calculation, we will consider the total volume of materials required as 1.54 m 3 for 1 m 3 of wet concrete. a) Bags of cement required:

Read More

Design & Cost Analysis of Self-Compacting Concrete For ...

1,2Civil Eng. Dept. - AIKTC, Panvel, 3V.P Technical (N.C.C) Abstract—This paper summarizes the research work performed to design a self-compacting concrete for Mivan/Aluminum shuttering and analyzing per cum cost of the designed concrete. High grade SCC was designed using mineral and …

Read More

Cost per sq ft Concrete Slab in India - Estimation ...

Oct 12, 2018· The design Mix concrete is poured and placed over the shuttering work. Make sure the mixed concrete is used within 30 minutes after mixing. Check the proper thickness of slab i.e. 125 mm, 150 mm or 175 mm generally. Use CONCRETE VIBRATOR for proper compaction of concrete. The vibrator is necessary otherwise concrete remains loose or honeycomb.

Read More

Curbed | Love where you live

Curbed is all things home, from interior design and architecture to home tech, renovations, tiny houses, prefab, and real estate.

Read More

Centering and Shuttering Guidelines | Centering ...

Shuttering or form work is the term used for temporary timber, plywood, metal or other material used to provide support to wet concrete mix till it gets strength for self support. It provides supports to horizontal, vertical and inclined surfaces or also provides support to cast concrete according to required shape and size.

Read More

Thumb rule of formwork quantity for High rise buildings.

Feb 26, 2013· As per the data the calulation goes like for 1 Cum Concrete the requirement of shuttering is 11.71813333 Sqm On concretable area for 1 Cum Concrete the requirement of shuttering is 3.767038414 Sqm On floor plate area Shuttering required for 1 Sqm on BUA 3.110701842 Sqm On BUA Concrete Coefficient / Sqm 3.767038414 Posted: 2187 days ago.

Read More

Labour cost is around Rs. 550.00 per cum of concrete and ...

Labour cost is around Rs. 550.00 per cum of concrete and shuttering (clients shuttering) labour cost is Rs. 220.00 per Sqm. ... hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft. 1029 types of laps in column 1541 Rate analysis of Vitrified tile in cement mortor 1:3 ...

Read More

Labor Requirement for Various Construction Works - The ...

1.80. 0.20. 10) Brick work in walls, one brick thick, in cement/lime mortar. (The constants could be adopted for brick work with any mix or mortar.) M 2: mason Labor. bhisti. 0.25 0.40. 0.10. 11) Formwork / Shuttering: a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork: 1 ...

Read More

How to calculate the Labor, equipment, shuttering & rebar ...

Aug 31, 2016· 1- material. 2- labour charge. material means :1- concrete price and that depend of wat element u want to cast it sub or super struc. and is it required green concrete or SRC or OPC approxmately it will be around AEd255 if its green concrete. oAed 215 if it SRC for mix …

Read More

How much number of bricks required 1cum & How much …

Sep 30, 2017· 500 no. of bricks (brick size - 20cm.*10cm.*10cm.) required for 1 cum of brick masonry. and suppose, ratio = 1:6 then, sum = 1+6 = 7 We use 30% mortar in brick work, So 1 cum of brickwork has 0.3 cum of mortar. Quantity for 1:6 mortar mix as we know, total dry mortar required for …

Read More

how much concrete can be poured in a day? | DIYnot Forums

May 06, 2014· 14 cube weighs in at about 35 tonnes of mixed product. With 130kg per mix that makes around 270 mix loads Without considering how your slaves are going to feel shovelling all that feed-stock into the mixer, I'd guess at an average of around 8 mixes per hour which works out at 34 mixing hours.

Read More

How To Calculate Cement, Sand, & Aggregate Quantity In 1 ...

Aug 03, 2018· Consider volume of concrete = 1m3. Dry Volume of Concrete = 1 x 1.54 = 1.54 m3 (For Dry Volume Multiply By 1.54) Now we start calculation for find Cement, Sand and Aggregate quality in 1 cubic meter concrete. CALCULATION FOR CEMENT QUANTITY; Cement= (1/5.5) x 1.54 = 0.28 m 3 ∴ 1 is a part of cement, 5.5 is sum of ratio

Read More

Thumb Rules For Civil Engineering | Thumb Rules For Civil ...

4. Thumb Rules For Shuttering Work. Shuttering costs are taken as 15-18% of the total construction of the building.Shuttering work is done to bring the concrete in Shape.The Thumb rule to estimate the shuttering required is 6 times the quantity of concrete or 2.4 times of the Plinth area.. For example, the concrete quantity is 0.5m 3, then. Area of Shuttering is 0.5 x 6 = 3m 2

Read More

What is cement concrete and which are various ratios ...

In the nominal mix concretes the constituents of concrete are measured by volume and the proportions are pre- determine such as 1:8:16, 1:4:8 1;3;6 and 1:2;4 etc. The unit of measurement of cement is a bag of 50 kg having a volume of 0.035 cum.

Read More

Types of Formwork (Shuttering) for Concrete Construction ...

Apr 13, 2020· The cost of formwork is considered as 20 to 25% of the cost of the structure in building work, it may be higher than this in bridges.In order to reduce the cost of form, it is necessary to design economical types of formwork and to mechanize its construction.. We should have to remove the form work when concrete has reached a suitable strength.

Read More

Civil At Work: Calculations Of Shuttering Material ...

Jul 10, 2013· Calculations Of Shuttering Material Requirement By Quick Method Estimation For 232 sqm (2500 sft) Of Slab Area SR. NO. MATERIAL REQUIRED. UNIT. MULTIPLYING CONSTANT BY THUMB RULE. APPROXIMATE QUANTITY OF MATERIAL REQUIRED. 1. Plywood 12 mm thick of size 2.44 m X 1.22 m (8'0"X4'0") 2500 sft. 0.02. 50 nos. sheets.

Read More

Design and Calculation of Formwork Requirement of Slabs ...

May 22, 2018· 2.9m H-beam = 1 x 17 = 17 pieces. Shoring Requirement Steel acrow props will be used for the shoring; Spacing = 1m c/c. Number required on the longer side = 16.12/1 + 1 = 17 pcs Number required on the shorter side = 12.53/1 + 1 = 14 pcs. Acrow props required = 17 x 14 = 238 pieces. Number of props required in the lift and staircase area

Read More

Concrete Calculator - Estimate Cement, Sand, Gravel ...

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg …

Read More

ANALYSIS OF RATES

1(a) Earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum. i) Labour Man Mulia 16 nos Each 55.00 880.00 Mulia 16 nos Each 55.00 880.00

Read More

how to calculate for 1 cubic meter concrete shuttering ...

Dec 14, 2012· What is the cement quantity of nominal mix 1 :2:4 …. May 14, 2009 · 7 cubic meters of loose mix will give 5 cubic meters of solid concrete. 1 :3:6, 1 cubic meter of cement …. QUANTITY FOR 1 :4:8 RATIO… how to calculate …. » More detailed.

Read More

How do I calculate how much steel I need?

Thumb rule to calculate the shuttering required is 6 times the quantity of concrete or 2.4 times of Plinth area. Suppose, the concrete quantity is 0.5m 3 then the shuttering area required is 0.5 x 6 = 3m 2.Components of Shuttering:- Shuttering Ply, Battens, Nails are components of Shuttering.

Read More

Deshuttering Time | When to Remove Concrete Forms ...

The rapid hardening cement the beams and arches complete removal of shuttering required 5 to 8 days. The shuttering removals time should be 8 to 10 days if the span of a beam and arches is more than 6 meters. Also, Read: Difference Between Formwork, Shuttering, Centering, Staging & Scaffolding. Earliest Time to …

Read More

how many kg of steel is required in m of concrete

* then the amount of water (generally between 130 and 150 Litres for 1m3 of concrete) * and lastly, if required, the amount of additives (a few Kilograms for 1m3 of concrete). One cubic metre of concrete weighs 2.5 Tonnes. Typically, 1m3 of concrete is made up of 350Kg of cement, 700Kg of sand, 1,200Kg of chippings and 150 Litres of water.

Read More

Concrete 1 cubic meter volume to cubic feet converter

Specific unit weight of concrete - amount properties converter for conversion factor exchange from 1 cubic meter m3 equals = 35.31 cubic feet cu ft - ft3 exactly for the masonry material type. To convert concrete measuring units can be useful when building with concrete and where handling of concrete is required. How much of concrete amount is ...

Read More

How To Calculate For 1 Cubic Meter Concrete Shuttering ...

Another formula is there for calculating how much cement is required.Divide 15.2 with the sum of numbers of the ratio.for example for 135 concrete15.21 3 51.69 cubic metre of cement for 10 cubic meter of concrete.so you will need 0.169 m3 of cement for 1 m3 of concrete.and 0.16930.507 m3 of …

Read More

CHAPTER 16 - RCC AND FORM WORK - MPWRD

cum 53.00 1609 Shuttering for reinforced concrete in foundation, column, footing etc. including all leads and lifts for all materials. sq. m 116.00 1610 Form work for R.C.C. in-situ, thickness not exceeding 20 cm, for slabs, lintels, beams, columns, etc. including all leads and lifts for all materials- (a) Up to 1.5 m height sq. m 159.00

Read More